I don’t think they’ll do it this way. I was just trying to find an engineering way to potentially answer the question of whether they could. I also don’t think it’s necessary.Wow - thanks for this! Do you have a price guess for the boost battery?
Having two batteries would add a lot of complexity, meaning additional R&D to figure out all the possible failure modes. I would guess if this was part of their max tow package, it would add at least $10k more to the cost of the vehicle, maybe $15k.
I think they can accomplish much the same thing by relaxing a bit on the maximum discharge rate of the main traction battery and starting the Harvester earlier.
Earlier in a different thread, @Jasco asked about climbing through the Rocky Mountains to the I-70 Eisenhower-Johnson Memorial Tunnel at the top of I-70. The original question was about making the climb with 0% state of charge. I don’t think that’s an approach I would ever choose. The I-70 climb from Denver to the summit is one of the most difficult climbs one can do while towing. The climb is 6% grade over the 12 miles up the mountain, climbing over 5800 feet in just 12 miles. I started the scenarios in Denver to make the assumption that the driver lives there and could be fully charged and fueled before starting their trip, if necessary. As you’ll see, that climb does not require a fully charged, fully-fueled vehicle.
I ran three scenarios.
A Harvester with 80 kWh battery, 80 kW generator.
A Harvester with 64 kWh battery, 80 kW generator.
A BEV with 140 kWh battery, no generator.
Given: Start in Denver, drive 67.1 total miles. Reach the summit with 10% remaining battery charge. Continue down a 7% grade to Silverthorne, CO to recharge. Maintain the posted speed limit at all times. Starting temperature in Denver is 105 ºF, Temperature at the summit is 85 ºF. No winds.
80 kWh battery, 80 kW generator:
With an 80 kWh battery, starting in Denver, CO requires 64.4% state of charge (51.5 kWh) to crest the Eisenhower Tunnel with your 10% (8.0 kWh) reserve, regenerating back up to 17.4% (13.9 kWh) upon arriving at the Silverthorne DC fast charger.
Across the full 67.1-mile trip, the vehicle's net electrical energy expenditure is 93.1 kWh (3.35 × 10⁸ J / 335.2 MJ), while total primary energy expenditure (accounting for the engine's 25% fuel-to-electricity efficiency plus net battery depletion) is 259.6 kWh (9.35 × 10⁸ J / 934.6 MJ). Total cost to replenish the battery and gasoline back to starting point is $0.51/kWh * 37.6 kWh + $4.20/gallon * 6.6 gallons = $46.90. You do have to go to two different refueling stations to fully recover both electricity and fuel. I can run the model assuming only gas stops.
64 kWh battery, 80 kW generator:
With a 64 kWh battery, starting in Denver, CO requires 78.0% state of charge (49.9 kWh) to crest the Eisenhower Tunnel with 10% (6.4 kWh) reserve, regenerating back up to 19.2% (12.3 kWh) upon arriving at the Silverthorne DC fast charger.
Because the vehicle's total GCW (16,300 lbs) and aerodynamics remain unchanged, total energy expenditure is identical to the 80 kWh case: 93.1 kWh (3.35 × 10⁸ J / 335.2 MJ) in net electrical energy, and 259.6 kWh (9.35 × 10⁸ J / 934.6 MJ) in total primary energy expended. Total cost to replenish the battery and gasoline back to starting point is $0.51/kWh * 37.6 kWh + $4.20/gallon * 6.6 gallons = $46.90. You do have to go to two different refueling stations to fully recover both electricity and fuel. I can run the model assuming only gas stops.
140 kWh battery, no generator:
With an all-electric tow vehicle (140 kWh battery, no onboard generator), starting in Denver, CO requires 74.6% state of charge (104.4 kWh) to crest the Eisenhower Tunnel with 10% (14.0 kWh) reserve, regenerating back up to 14.7% (20.6 kWh) upon arriving at the Silverthorne DC fast charger.
Because there is no combustion engine generating 120 kW of waste heat (eliminating the ~8.5 kW engine radiator fans and long-loop coolant pump) and no 25% thermal-to-electric conversion loss, total primary energy expended drops by 67.7%—from 259.6 kWh (934.6 MJ) in the series hybrid down to 83.9 kWh (301.9 MJ). Total cost is $0.51/kWh * 83.9 kWh = $42.79. One stop for energy recovery.