Probably not. He was telling me that the community is just one small thing he does at SM.It’s Spring Break. I hope he’s getting some rest.
Probably not. He was telling me that the community is just one small thing he does at SM.It’s Spring Break. I hope he’s getting some rest.
Oh Lord, won’t you buy me an IH vanI offer this pic for Happy Friday. 12 minutes with Gemini asking for a modern take on the old IH Metro vans. Tried to get a bit more SM detail in this but then thought-why-it’s pretty cool as is. And somebody’s gonna love the color
We all need to be calm and Scout on!Happy Friday! What exactly do you mean @THil08
Yeah, you'd think with the R2 launch going well, there'd be a little more "counter-programming". Even being 2 years out of production, you don't want to lose too much momentum. The upcoming events should help, but they're limited by geography - hopefully a lot of good info comes out of them.Happy Friday!
We all should be really happy, we are all moving up the reservation line. People are dropping their spots due to poor communication on Scouts end. Which I agree with, it needs to be more transparent. Stop with the cryptic wording, and tell us what’s happening. We all don’t want this to be another EV startup fail.
Thanks Jamie for then update! It’s massive!! Can we pretty please with a cherry on top have a camera at the end of the line and get pictures of our Scouts on their wait out of the building? Like Disneyland takes pictures of you on Space Mountain towards the end of the ride.Happy Friday!
Another crazy week at Scout. I spent most of the week at the factory going through safety training, so we can start filming inside the factory, cover the latest progress, and share it with all of you. I haven't been inside the buildings in several months, so it was quite a shock to see how much progress has been made inside. There are crews and crews of people working and navigating around each other, running wires, installing equipment, moving forklifts, lift trucks hauling supplies, robots being programmed and tested, and so much more. It is really staggering to see its size and scope. We will have a lot of new updates and content between now and production starting up.
The new Scout Motors Training Center is already training new factory employees and we had a chance to tour that as well (full story on that coming later). Here is an exterior shot:
View attachment 14778
This shot above was taken the blue circle on the map:
View attachment 14780
This shot (below) was taken at the location indicated by the red circle above. The red circle is over the area where completed Scouts receive final checks, are signed off, and are driven out the door at the end of the building, where they go to the marshaling yard to be shipped or to the accessories building to be factory-fitted with accessories.
View attachment 14781
It is hard to see, but that small square of light at the end is where finished Scouts will leave the building.
Lastly, a view of Traveler most don't see much from above.
View attachment 14782
Thanks Jamie for then update! It’s massive!! Can we pretty please with a cherry on top have a camera at the end of the line and get pictures of our Scouts on their wait out of the building? Like Disneyland takes pictures of you on Space Mountain towards the end of the ride.
YAY!!Definitely something we've talked about.
Thanks for the update.Happy Friday!
Another crazy week at Scout. I spent most of the week at the factory going through safety training, so we can start filming inside the factory, cover the latest progress, and share it with all of you. I haven't been inside the buildings in several months, so it was quite a shock to see how much progress has been made inside. There are crews and crews of people working and navigating around each other, running wires, installing equipment, moving forklifts, lift trucks hauling supplies, robots being programmed and tested, and so much more. It is really staggering to see its size and scope. We will have a lot of new updates and content between now and production starting up.
The new Scout Motors Training Center is already training new factory employees and we had a chance to tour that as well (full story on that coming later). Here is an exterior shot:
View attachment 14778
This shot above was taken the blue circle on the map:
View attachment 14780
This shot (below) was taken at the location indicated by the red circle above. The red circle is over the area where completed Scouts receive final checks, are signed off, and are driven out the door at the end of the building, where they go to the marshaling yard to be shipped or to the accessories building to be factory-fitted with accessories.
View attachment 14781
It is hard to see, but that small square of light at the end is where finished Scouts will leave the building.
Lastly, a view of Traveler most don't see much from above.
View attachment 14782
I didn’t even know that was a thing.@Jamie@ScoutMotors to the left of the red circle, is that the run track to put the mandatory mile on each vehicle? I remember BMW having that at their factory and was fun to see them launch the vehicles out and around and back I to the plant
@Jamie@ScoutMotors to the left of the red circle, is that the run track to put the mandatory mile on each vehicle? I remember BMW having that at their factory and was fun to see them launch the vehicles out and around and back I to the plant
Hypothetically what is the actual point of that. Just to be sure nothing blows up or falls apart? Hypothetically of courseMaybe...![]()
God that place is massive. No wonder its gonna be another 10 years till scouts are rolling off the assembly line LMAOHappy Friday!
Another crazy week at Scout. I spent most of the week at the factory going through safety training, so we can start filming inside the factory, cover the latest progress, and share it with all of you. I haven't been inside the buildings in several months, so it was quite a shock to see how much progress has been made inside. There are crews and crews of people working and navigating around each other, running wires, installing equipment, moving forklifts, lift trucks hauling supplies, robots being programmed and tested, and so much more. It is really staggering to see its size and scope. We will have a lot of new updates and content between now and production starting up.
The new Scout Motors Training Center is already training new factory employees and we had a chance to tour that as well (full story on that coming later). Here is an exterior shot:
View attachment 14778
This shot above was taken the blue circle on the map:
View attachment 14780
This shot (below) was taken at the location indicated by the red circle above. The red circle is over the area where completed Scouts receive final checks, are signed off, and are driven out the door at the end of the building, where they go to the marshaling yard to be shipped or to the accessories building to be factory-fitted with accessories.
View attachment 14781
It is hard to see, but that small square of light at the end is where finished Scouts will leave the building.
Lastly, a view of Traveler most don't see much from above.
View attachment 14782