Don’t dash my dreams! But I think you are right. Voice of reason and all.They've said production "starts" in 2027, I think Scott even said "late 2027" in one of his interviews I watched so I wouldn't expect it to actually start arriving in driveways until 2028 at the earliest.
These things usually run into delays and setbacks and it takes time to ramp up factories, especially ones that haven't even been built yet so I will be pleasantly surprised if they start deliveries at all in 2028 and outright shocked if any vehicles manage to get delivered to customers in 2027.
Agree, I’m think best case we start seeing general public delivery’s Q4 ‘28, with anything prior being early review models and a marketing fleet.They've said production "starts" in 2027, I think Scott even said "late 2027" in one of his interviews I watched so I wouldn't expect it to actually start arriving in driveways until 2028 at the earliest.
These things usually run into delays and setbacks and it takes time to ramp up factories, especially ones that haven't even been built yet so I will be pleasantly surprised if they start deliveries at all in 2028 and outright shocked if any vehicles manage to get delivered to customers in 2027.
I just keep trying to put a positive spin on it. Just more time to save for that down.Agree, I’m think best case we start seeing general public delivery’s Q4 ‘28, with anything prior being early review models and a marketing fleet.
And in the ABC factory update and interview with Scott, they said late 27’ Fall.They've said production "starts" in 2027, I think Scott even said "late 2027" in one of his interviews I watched so I wouldn't expect it to actually start arriving in driveways until 2028 at the earliest.
These things usually run into delays and setbacks and it takes time to ramp up factories, especially ones that haven't even been built yet so I will be pleasantly surprised if they start deliveries at all in 2028 and outright shocked if any vehicles manage to get delivered to customers in 2027.
I’m gonna count on late ‘27 delivery. Originally it was ‘26 and factory is still on schedule so I can’t imagine losing a year UNLESS:Says production 2027 do we anticipate deliveries happening in 2027? Will this be a 2027 model or 2028.
Come on 2027I’m gonna count on late ‘27 delivery. Originally it was ‘26 and factory is still on schedule so I can’t imagine losing a year UNLESS:
A-the harvester delays due to more engineering so only BEVs start mid/end of ‘27. Typical car build is less than a day and load/transport is 2 weeks worst case? If factory delivery it’s 30minutes.
Or B-SM is holding out for the Canadian battery factory to come on line that is being built and intentionally slowing pace to capitalize on a shipping/savings/tech advantage which everyone would benefit from.
We aren’t even mid ‘25 yet and paint shop is being fitted out. Even with 12-15 months of construction left that gives them 6 months of full production to get testers out, so Q4 of ‘27 is still very doable in my mind. Buildings are basically closed in now or within a month or so-so even weather won’t slow things down then-it’s all controlled environment
I love your optimism but I'm not going to hold my breath. 2028 for first deliveries and I'm sticking to it!I’m gonna count on late ‘27 delivery. Originally it was ‘26 and factory is still on schedule so I can’t imagine losing a year UNLESS:
A-the harvester delays due to more engineering so only BEVs start mid/end of ‘27. Typical car build is less than a day and load/transport is 2 weeks worst case? If factory delivery it’s 30minutes.
Or B-SM is holding out for the Canadian battery factory to come on line that is being built and intentionally slowing pace to capitalize on a shipping/savings/tech advantage which everyone would benefit from.
We aren’t even mid ‘25 yet and paint shop is being fitted out. Even with 12-15 months of construction left that gives them 6 months of full production to get testers out, so Q4 of ‘27 is still very doable in my mind. Buildings are basically closed in now or within a month or so-so even weather won’t slow things down then-it’s all controlled environment
I ordered my personalized plate already with a 2028 model year in mind. Just don’t get pushed to 2029 that’s all I ask!I love your optimism but I'm not going to hold my breath. 2028 for first deliveries and I'm sticking to it!
Considering it’s not COVID and hopefully no massive backlog of parts constraints so should be on schedule.I ordered my personalized plate already with a 2028 model year in mind. Just don’t get pushed to 2029 that’s all I ask!
And the very first few will probably be for engineers to find kinks to fix in updates or recalls, and for media purposes.My guess would be the first models will be sent out late 2027 but that could be in really limited numbers (I'm thinking in the tens or hundreds to meet the 2027 release date target) and then the bulk of us will get them in 2028.
You could tell who the Rivian engineers were in town. They were the first ones with the trucks in their driveway.And the very first few will probably be for engineers to find kinks to fix in updates or recalls, and for media purposes.
Lucky bastards. Getting to drive them around months prior to full release, but it does help with future development.You could tell who the Rivian engineers were in town. They were the first ones with the trucks in their driveway.
I was hoping for 27 on my plate which ironically will be half my age at that pointI ordered my personalized plate already with a 2028 model year in mind. Just don’t get pushed to 2029 that’s all I ask!